---
title: Trade Promotion Optimization Planning — Input Variables and Constraints
description: Learn which variables and constraints Trade Promotion Optimization Planner considers when optimizing user-defined performance objectives.
---

[River Logic Blog | Prescriptive Analytics Blog](https://download.riverlogic.com/blog)

# [Trade Promotion Optimization Planning — Input Variables and Constraints](https://download.riverlogic.com/blog/trade-promotion-optimization-planner-input-variables-and-constraints)

 Written by [Nathan Goldstein](https://download.riverlogic.com/blog/author/nathan-goldstein) | Feb 11, 2011

My answer highlights how TPO Planner uniquely enables what-if analyses regarding the variance of variables and constraints impacting and governing the productivity of trade promotion investments.

[Trade Promotion Optimization](https://www.riverlogic.com/solutions/trade-promotion-optimization/) considers the following variables:

- Non-promoted Retail Price (by product and customer with ability to specify seasonal variations)
- Non-promoted Demand Volume (by product and customer with ability to specify seasonal variations)
- Cost of Goods Sold (by product with ability to import from existing standard costing systems and/or River Logic’s Integrated Business Planning solution)
- Promotion Cost (fixed and variable costs including lump sum payments and off-invoice, bill-back and scan-down amounts, as well as promoted retail price)
- Promotion Performance (deal length, time frame for increased volume impact, time frame for forward-buy impact, volume lift index)

TPO Planner considers the following constraints:

- Promotion Budget (by customer and brand with ability to request incremental funds)
- Volume/Revenue Targets (by customer and brand with ability to specify minimum targets as ‘soft’ constraints while optimizing for profit)
- Promotion Rules (minimum and maximum frequency for all deal types, pre- and post-gap restrictions, seasonal validity, always/never promote together)
- Preferred/Blackout Time Periods (by customer, brand and product)

In the future, TPO Planner will also consider the following variables and constraints:

- Cross-promotion Elasticity (impact on base volume and lift indexes across multiple events, products, and customers)
- Capacity/Inventory Constraints (by product with ability to explore alternative sourcing options through River Logic’s Integrated Business Planner solution)

[View full post](https://download.riverlogic.com/blog/trade-promotion-optimization-planner-input-variables-and-constraints)

```json
{
  "@context" : "http://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Nathan Goldstein"
  },
  "dateModified" : "2019-02-21T05:16:29.049Z",
  "datePublished" : "2011-02-11T11:07:00Z",
  "headline" : "Trade Promotion Optimization Planning — Input Variables and Constraints",
  "image" : {
    "@type" : "ImageObject",
    "height" : 1212,
    "url" : "http://cdn2.hubspot.net/hubfs/484375/Blog_Images/Fotolia_85904555_Subscription_Monthly_M.jpg",
    "width" : 1568
  },
  "mainEntityOfPage" : "https://download.riverlogic.com/blog/trade-promotion-optimization-planner-input-variables-and-constraints",
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "height" : 60,
      "url" : "/hs/hsstatic/content_shared_assets/static-1.4092/img/default-amp-logo.png",
      "width" : 60
    },
    "name" : "Latest Insights"
  }
}
```